Difference between revisions of "Azure Line"
From Joban Wiki
		Views
Actions
Namespaces
Variants
Tools
| AmberFrost (talk | contribs) m (Fix) | |||
| Line 4: | Line 4: | ||
| == History == | == History == | ||
| On November 12th,  | On November 12th, 2018, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever. | ||
| '''''[To be completed]''''' | '''''[To be completed]''''' | ||
Revision as of 00:02, 18 August 2024
Azure Line
  
 A poster made for the opening of Azure Line
General
| Status | Operational | 
|---|---|
| Owner | OrchidLink | 
| Termini | Odysseus Kakai | 
| Stations | 11 | 
Service
| Type | Rapid Transit | 
|---|---|
| Operator(s) | OrchidLink | 
History
| Opened | November 12th, 2023 | 
|---|
| Operating speed | 120 km/h (avg) | 
|---|
Route Map
The Azure Line is a rapid transit/heavy rail route operated by OrchidLink.
History
On November 12th, 2018, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever.
[To be completed]

