Difference between revisions of "Tohoku Shinkansen"
Views
Actions
Namespaces
Variants
Tools
(Created page with "{{InfoBox |title=Tohoku Shinkansen |colorline1=#1BC4EF |image=2022-03-08_12.43.12.png |imgdesc=An KCR E5 CAF Train boarding at Central South station |category1=Overview |operators=KCRC |terminus=Central South<br />Fuka<br />Adobe<br />Touhou |stations=8 |serviceCategory=Service |line_type=Express |depots=Adobe<br />Touhou |rolling_stock=[https://en.wikipedia.org/wiki/MTR_Adtranz%E2%80%93CAF_EMU Adtranz-CAF] |former_ro...") |
(No difference)
|
Revision as of 17:57, 17 April 2022
| Termini | Central South Fuka Adobe Touhou |
|---|---|
| Number of stations | 8 |
| Type | Express |
|---|---|
| Operator(s) | KCRC |
| Rolling stock | Adtranz-CAF |
| Depot(s) | Adobe Touhou |
| Opened | July 7, 2001 |
|---|
| Line Length | 35km |
|---|---|
| Track gauge | 1,435mm |
| Electrification | 3 kV DC |
The Tohoku Shinkansen (Chinese: 東北新幹線) is a express rs transit operated by KCR.
The route has a total of 8 Stations.
History
The Tohoku Shinkansen formerly is Joestu Express and Sleigh Liner
Joestu Express
Joestu Express has a total of 3 Stations, plan for 6 cars.
| Station Name | Station Name (English) | Connections | Opening Date |
| 負荷 | Fuka | Joestu Line, Fuka Lightrail | 7 July 2001 |
| 華生東 | Watson East | Watson Station | 7 July 2001 |
| 阿豆比 | Adobe | Surry Quays | 7 July 2001 |
Dispute
Platforms use by Joestu Express in Fuka design just for 4 cars, but Watson East and Adobe already build platforms for 6 cars,finally plan Joestu Express both 4 cars and 6 cars are run on the Joestu Express.
Sleigh Liner
The KCRC also made proposals to plan, build, and operate the Sleigh Liner, a new railway parallel to Joestu Line to make going to Sendai faster; the KCRC received permission for the project from the government on 24 September 2007. Disputes on the funding and, postponed the construction by a year to 2008. Construction started on 7 June 2008. The new link started operation on 16 August 2010.
Sleigh Liner first plan has total of 3 Stations , plan for 4 cars.
| Station Name | Station Name (English) | Connections | Opening Date |
|---|---|---|---|
| 負荷 | Fuka | Joestu Line, Fuka Lightrail
Rigel LineAirport Express,Joestu Express |
16 August 2010 |
| 阿豆比 | Adobe | Joestu Express | 16 August 2010 |
| 東方 | Touhou | Joestu Line,Aozora Line | 16 August 2010 |