Difference between revisions of "Azure Line"
From Joban Wiki
Views
Actions
Namespaces
Variants
Tools
AmberFrost (talk | contribs) m (Fix) |
|||
| Line 4: | Line 4: | ||
== History == | == History == | ||
On November 12th, | On November 12th, 2018, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever. | ||
'''''[To be completed]''''' | '''''[To be completed]''''' | ||
Revision as of 00:02, 18 August 2024
Azure Line
A poster made for the opening of Azure Line
General
| Status | Operational |
|---|---|
| Owner | OrchidLink |
| Termini | Odysseus Kakai |
| Stations | 11 |
Service
| Type | Rapid Transit |
|---|---|
| Operator(s) | OrchidLink |
History
| Opened | November 12th, 2023 |
|---|
| Operating speed | 120 km/h (avg) |
|---|
Route Map
The Azure Line is a rapid transit/heavy rail route operated by OrchidLink.
History
On November 12th, 2018, Azure Line was opened to the public, providing people with fast & comfortable rides, making interchanging with other lines easier than ever.
[To be completed]